High-speed train line Nîmes-Montpellier (France)

27.10.2015

Focus on the under-tracks structure of Manduel (Gard).
Following the 1000 lm base-slab carried out in the open-air, we are  fixing rebar of the foundation base-slab, under French Railways tracks currently in use.
 
We have choosen heavy-duty pre-fabrication in our facility allowing us to carry out this section of structure in a very tight schedule.