Miramas bypass main engineered structure (France)

13.11.2015

The fixing team of SAMT Pose have just completed the Miramas, France, bypass main engineered structure.
For these unusual concrete/steel mixed pillars, we were in charge of placing anchor rods through the reinforcement bar.