A great operation perfectly mastered by our Reunionese teams. Prefabrication in the factory of two beams 24 m long and weighing more than 17 tonnes each, lifting and exceptional transport at night, installation in less than a day on the site. A gain on the two-week schedule. (Client: GTOI)