Construction site: new Larivot bridge in Cayenne, French Guiana, France

End of assembly of the first pile header. The reinforcements are assembled in a template on the ground, then the entire element will be transported by a barge to the middle of the river to be placed in the formwork, in one piece. Remember that the construction of the new Larivot bridge, which will be 1,300 meters long, is described as a “technical feat” due to the complex geotechnical context. (Client: Joint-Venture Soletanche-Dodin Campenon Bernard)

en_GBEnglish