Our Reunion Island teams are currently working on the future pedestrian and cycle bridge which will connect Pierrefonds village to the future ZAC Roland Hoarau, an economic activity zone of nearly 87 hectares. 300 meters long, this footbridge made up of a succession of arches will cross the 4 lanes. In order to reduce production times, the reinforcing cages for the foundation blocks which will support the feet of the arches are entirely prefabricated in our Le Port factory, including the embedded rods. These reinforcement cages are then delivered to the site and installed very precisely through micropiles. A great technical success. (Client: PICO Indian Ocean) (Photo credit of the computer-generated view: Altitude 80 Architecture)